
Caterpillar
515-4037: 16mm Diameter Final Drive Dowel PinPrice¥220
Lead time35 days
Availability:ChinaRest

| OEM / Part No. | 239-0689 |
|---|---|
| Manufacturer | Caterpillar |
| Category | Pins |
| Country of Origin | Origin on request |
| Weight | 0.01 kg |
| Dimensions | 0.097 Х 0.071 Х 0.013 |
| Unit of Measure | pcs |
| Condition | New original part |
239-0689 Caterpillar 50mm Long Lead End Steel Dowel Pin is made of Hardened Steel,Low Alloy Steel. The specified material for this part is Hardened Steel,Low Alloy Steel.
| Pin Type | Непрерывное |
|---|---|
| Pin Diameter (mm) | 11,0 |
| Overall Length (mm) | 50,0 |
| Material | Закаленная сталь |
| Notes | Тип торца: ходовой винт/ходовой винт |
| Pin Diameter (in) | 0,43 |
| Overall Length (in) | 1,97 |
Pickup from the supplier's warehouse in Shenzhen, China, or in Moscow, Russia.
Payment in Chinese yuan (CNY) to our company bank account in China, or in Russian rubles (RUB) to the Russian company bank account.
Warranty and delivery terms are confirmed on request.